Email: caoi.ir@post.com Telegram ID: @caoiran

IN THIS PART, YOU WILL ACCESS TO THE PROJECTS DESIGNED AND CONSTRUCTED BY IRANIAN ARCHITECTS INSIDE AND OUTSIDE OF IRAN.
TO KNOW ABOUT HOW YOU COULD SUBMIT YOUR PROJECT, PLEASE CONTACT US!

Shadow
Slider

Tukarang Paint Factory

/23

 

PROJECT GENERAL INFORMATION

 

Name: Tukarang Paint Factory

Location: Razi industrial zone, Isfahan, Iran

Architecture Firm: Logical Process in Architectural Design []

Architects in Charge: Elham Geramizadeh, Ehsan Hosseini

Date: 2014

Area: 6000 sqm

Building Type: Industrial

Photographer: Parham Taghioff

Awards: Honorable mention in the 1st biennial of Architecture & Interior design,in public building category, held by Honar-o- Memari Magazine - 2014

 

Design of factories is usually defined by placing two main performances of production line and an administrative building beside each other. In Iran, production line building is mainly designed beforehand and a designer is expected to add a sumptuous administrative building to the workshops that made earlier.Three workshops were predicted as the factory’s production line in this project. They belonged to a paint factory for sheets of steel industrial complex near Isfahan-Shahreza road. Therefore, we attempted to provide a different form of administrative-industrial buildings by defining office and service volumes beside it and composing two office and industrial performances as far as form, performance and structure were concerned.

Organizational identity is of the main objectives of production complexes and a building design takes a major role in creating this identity. By inspiring the company product, industrial sheets and using only three colors, i.e. yellow, blue, and white, heavy volumes of the project were cleared and sewn using a folded sheet.The folded sheet, which is on the west side adjacent to a street, is considered as an identity symbol of the complex without openness. It encompasses internal clear and shady courtyards. Therefore, a natural ventilation and maximum use of shade is achieved in the hot and arid region. Foundation of the project is about 6000 sqm. It has a steel structure, which is heated by radiators and packages and cooled by evaporative coolers. The project was completed in September 2014.

 

 

Projects-Social 2 Projects-Social 3 Projects-Social 4

Read 4681 times Last modified on Thursday, 14 April 2016 22:53